29. 10. 2020
Reconstruction within 4 Hours
At the beginning of November, the HUTIRA Slovakia s.r.o. Company carried out the reconstruction of the RS 100 1/1 – 440 (VTL RESO) station in Rakoluby residential area. The operation included both main line bypass and regulation line bypass. This solution was selected in order to ensure continuous supply of natural gas during maintenance/failure of the regulation line. Thanks to careful preparation phase at the workshop, the service technicians of HUTIRA Slovakia managed to resume the NG supply in just 4 hours.
before
installation
after